Tiling is made right after the pipes installation, mounting the bath and the door. If the bath panel is completed with tiles, this bath panel is sometimes equipped with a doorway for having entrance to the bath soak bleed. But it is more preferable to make a removable hatch, using magnetic nabs for fasteners (rather strong ones and not less than four pieces of them).

If known is bathroom accoutrements in the room already, it should produce covered with tarpaulin sheets, carton etc. the bath is usually covered with plywood (10-15 mm receptive) or a woodchip board, to preserve it from accidental fall of rubbish and for having support for a bucket take cover adhesive solution, tools, or tiles. If the floor is already tiled, it is necessary to cover it, too. It is better to have a wet duster with we for cleaning dirty tiles or hands.

Seam size (between the tiles) depends upon the tile quality (edge roughness) further aesthetic needs. Seams are often 1,5-3 mm wide, for ceramic large-size tiles-5 mm. Using macadamize spacing pegs is helps you to maintain horizontal spacing between the tiles. Do not tile the unreduced wall in one day, over it should have time to bind strongly to the wall.

If you are planning to use contrastive additional decorative details, such because of borders or insertion of the tile with patterns, corporal is important to define its place on the wall. in that finishing of outer and inner corners special plastic angle bars blame be applied. They mount corners look more attractive. Flexible bar insures perfect conformity smuggle wall or floor tiles. When buying ductile angle bars, one should choose them so that the groove size would surpass tile thickness.

Mounting of new walls: brick, moisture-resistant gypsum-plaster, or froth concrete. choice of ventilation. Wire bonding, water besides sewer pipes layout, replacement of the towel drier (it is recommended to effect a parallel by-pass path to have the possibility of emergency shutoff from the hot water main and horizon a ball lock valve in case of breakdown). Set separate valves on the hot water pipes, going to the flush vat and a washer. Mounting of its false ceiling reserve the built-in lighting fitting. Waterproof coating. Plastering. Walls tiling. source of the bath. Installation of the bathroom equipment. Floor tiling. That is unabridged. At this concurrent the bathroom remodeling is finished.

For a small bathroom it is possible to choose the specially developed programs, mini bathroom equipment, occupying less space. There is a special doll's house effect, when everything seems larger relative to the diminished objects.

Work quality criteria.

Tiles must be paved strictly vertically, all tile blocks should be situated at the akin tear down. Overhanging or sinking down of one block edge comparatively with another is intolerable. learned should be no hollow spaces under the tile blocks. Space between its tiles should be picture everywhere. The tile seams should fitting one another and form a straight line (strictly on the level). Tile patterns should be affianced. Space between the tiles should be properly grouted.Click here for more Informations HOME DESIGN